Today, let’s talk about the switching problem of security power. First of all, we have three assumptions initial conditions, as shown in the figure (see Figure 1 for details). Initial conditions 1-3, condition 1 is the feeder switch 08, 09, 12, and 13 are in the closed position, initial condition 2 is the feeder switch 01, 02, and 03 are in the closed position, initial condition 3 is the feeder switch 07 and 10 are in the closed position, through the above initial conditions, we know that during the initial normal operation, the working PC1 section is running with security MCC1 section, the working PC2 section is running with security MCC2 section runs generator dual power switching logic copyright by: www.hxdlkj.com Switch logic 1: Jump on the 09 switch, the security MCC1 section loses power, the switching logic will instantly jump on the 07 switch and delay 11 switch. In this way, the security MCC1 section is powered by the working PC2 section, and a switching is completed. The switching between the two sections is generally between 1-2