18553382068 13951158508
News Center
front page / News Center / Technical support / Eight aspects that affect the operating limits of generator sets

Eight aspects that affect the operating limits of generator sets

Views: 0     Author: Site Editor     Publish Time: 2014-07-25      Origin: Site

Inquire

wechat sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button



1: The voltage and cycle fluctuation ranges are within the allowable values.

2: The motor generator does not exceed the load capacity

3: Power factor, in the late phase 0.85~0.95, the power factor is allowed to be 1 during automatic excitation adjustment.

4: No temperature rise test has been carried out, and operation beyond the nameplate data is not allowed.

5: During phase advance operation,Generator setShould meet the phase advance operating conditions

6: The machine and furnace have no defects that affect the operation of the unit.

7: The temperature rise of the main transformer is within the allowable value.

8: System stability requirements

In order for the generator set to perform its power supply function in good condition, in addition to observing the status of the equipment, we also need to conduct regular health checks, record the usage of the equipment, and perform various maintenance and repairs as needed. Has everyone done this?

More than 20 years of experience in gas power generation engineering application. It has the ability to provide integrated operation services of technology, equipment, engineering design, construction, operation and services.

Contact us

18553382068
13951158508
2260661851@qq.com
2260661851
www.hxdlkj.com
all rights reserved Su ICP No. 19030651-1 Sitemap