18553382068 13951158508
News Center
front page / News Center / Technical support / Diesel generator room setting principles

Diesel generator room setting principles

Views: 0     Author: Site Editor     Publish Time: 2013-04-03      Origin: Site

Inquire

wechat sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

Diesel generator setWhen used indoors, there may be a special machine room. Depending on the working status and performance of the generator set, the setting of the machine room also has requirements. Haixing has compiled a few principles and matters to share with you:

The principle of layout of the machine room where the diesel generator set is installed is to ensure the conditions required for the normal operation of the unit (including diesel engine, generator and control panel) and to facilitate operation, maintenance and maintenance. Users should consider the specific layout plan based on the actual situation of the unit and the specific models used. The following matters should be paid attention to when designing the computer room:

(1) An operating room with sound insulation facilities and an observation window should be set up next to the power distribution room to facilitate the operator to grasp the operating status of the diesel generator set in a timely manner.

(2) The exhaust pipe outlet and muffler should be installed outdoors, and the exhaust guide pipe should not be too long.

(3) Pipes and cables should be laid in trough plates or trenches as much as possible to keep the machine room clean and convenient for use and maintenance.

(4) Requirements for lightning protection, ventilation, sound and vibration isolation, fire protection, heating, lighting and sewage discharge should be considered.

(5) The fuel tank can be placed indoors or outdoors, but the structure and placement of the fuel tank should meet the usage requirements.

(6) The closed diesel generator set should have its radiator facing outdoors. Users of open diesel generator sets should set up their own cooling water heat dissipation devices.

(7) The area size of the computer room can be determined based on the cooling method.

Paying attention to the setting up of the computer room is also an important measure to ensure production and avoid future failures that will affect production. Therefore, Haixing recommends that everyone still plan the construction of the computer room in detail.

More than 20 years of experience in gas power generation engineering application. It has the ability to provide integrated operation services of technology, equipment, engineering design, construction, operation and services.