Operating procedures for Cummins diesel generator sets

Views: 0     Author: Site Editor     Publish Time: 2012-10-09      Origin: Site

Inquire

wechat sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

After purchasing a Cummins diesel generator set, customers should pay attention to safe use and strictly abide by operating procedures to ensure the normal operation of the diesel generator set. So, what are the specific operating procedures for Cummins Haixing will introduce it to you here. diesel generator sets ?

Preparation before starting the machine
1. Check whether the oil level of the diesel engine crankcase is normal and check whether the cooling water tank is cooled (cooling water and engine oil should be enough).
2. Open the diesel valve to clear the fuel pipeline.
3. Manually check whether there are any signs of jammed moving parts.
4. Whether the starting motor current meets the starting requirements.
5. Check whether the water pump, oil pump, and fan conveyor belt are normal.
6. After confirming the above check, start the diesel generator.

2 Start
1. Close the starting power switch and start.
2. After the diesel generator is started, run on the no-load for 5 minutes. After confirming that the cooling water temperature and engine oil temperature are normal, the power distribution will be distributed.
3. Close the generator output switch, disconnect the mains power, close the power generation distribution knife switch on the distribution cabinet, and distribute the power according to the electricity consumption requirements.

3. Management during operation
1. During the generator operation, a dedicated person should be assigned to be on duty, and pay attention to the oil pressure, water temperature, etc. during the duty.
2. Pay attention to whether the generator has odor, abnormal noise, odor, abnormal response shutdown inspection during duty, and report to the Equipment Department for processing.

Four shutdowns
1. Unload the load, close the market power generator gate, and develop the motor output knife gate. Wait for the generator to run for 5-10 minutes without load, and the oil and water temperature drops to 40-55 degrees.
2. In order to keep the emergency diesel generator clean and tidy, clean the fuselage after shutdown.

Five maintenance and maintenance
1. Diesel engine maintenance generally requires moderate repair for 2500 hours to 3000 hours. Intermediate revision content: Check and replace parts for the gas part, connecting rod shaft, etc.
2. This machine uses Cummins engine oil. The engine oil is generally used continuously for 250-300 hours, and the engine oil and oil filter are replaced.
3. Diesel filter and water filter depend on the use.

The above are the operating procedures of Cummins diesel generator sets listed by Haixing for everyone. We hope that relevant staff will refer to and abide by them during specific operations. This will not only extend the service life of Cummins diesel generator sets, save corporate costs, but also ensure safe production and expand corporate benefits.



More than 20 years of experience in gas power generation engineering application. It has the ability to provide integrated operation services of technology, equipment, engineering design, construction, operation and services.